01kW ↔ HP Converter
Quick motor power conversion
02Single-Phase Current
Current from kW, voltage, PF and optional efficiency
Use efficiency 1.00 when kW is electrical input power. For motor shaft-output kW, enter the motor efficiency.
03Three-Phase Current
Current from kW, voltage, PF and optional efficiency
Use efficiency 1.00 when kW is electrical input power. For motor shaft-output kW, enter the motor efficiency.
04kW / kVA / kVAR / PF
Power triangle calculator
05APFC Capacitor kVAR
Power factor correction requirement
06Capacitor Bank Current
3-phase capacitor current from kVAR
07Transformer Size
Preliminary kVA sizing with margin
08Transformer Full-Load Current
Primary/secondary current check
09DG / Generator Size
Running-load kVA estimate
10Preliminary Cable Size
Current-density + voltage-drop screening
Screening only; final ampacity depends on installation, ambient temperature, grouping, insulation, harmonics and short-circuit withstand.
11Voltage Drop
AC voltage drop using R and X
12Transformer Secondary Fault Current
Approximate terminal short-circuit current
Approximation excludes upstream/cable impedance, motor contribution and X/R effects.
13MCB / MCCB Preliminary Rating
Next standard current rating from design current
Final breaker selection requires cable ampacity, fault rating, trip curve/settings and discrimination.
14Motor Contactor & OLR Guide
FLC and preliminary AC-3 selection aid
Use motor nameplate current and manufacturer AC-3/overload data for final selection.
15Earthing Conductor , Adiabatic Check
S = I√t / k
Verify the correct k-value for conductor material, insulation and temperature limits.
16Motor Starting Current
DOL, star-delta, soft starter or VFD estimate
Actual starting current varies by motor design, load torque and starter settings.
173-Phase Unbalance
Voltage or current unbalance percentage
18Connected Load & Maximum Demand
Demand-factor based estimate
19Power from Voltage & Current
Calculate kW, kVA and kVAR
20Rooftop Solar Size & Simple Payback
Energy-offset sizing and payback estimate
Simple estimate only; actual output/economics depend on roof, shading, losses, tariff/net-metering rules and financing.