A low or unstable power factor may have more than one cause. We review operating load, capacitor-bank steps and switching behaviour before discussing correction.

What we review

  • Existing and desired power factor
  • Reactive-power requirement and capacitor-bank sizes
  • APFC relay settings, step operation and contactor condition
  • Relevant harmonics and operating-load variation

What you can expect

  • Study findings and data-backed observations
  • Approximate kVAR need where assumptions are sufficient
  • Recommended further investigation or corrective action

Before we begin

These questions help us understand the site and propose a suitable scope.

  • Is the PF consistently low or changing?
  • Have capacitor steps failed or tripped?
  • Is a recent electricity bill available?
Important scope note

Capacitor sizing is preliminary until harmonics, switching duty and operating conditions are considered.